Properties

Browse or get in touch to schedule a walkthrough.

  • Nearby me
Price range

Popular features

Community features

Association

Property features

Waterfront

View

Exterior Features

Interior Features

Style

10000 properties match your criteria

Updated 1 minute ago

E-Alert name

Welcome to 508 Myrtle Court, located in the highly desirable Trails at Bear Creek neighborhood in Keller. Nestled just off scenic walking trails and minutes from Keller Pointe, the dog park, natatorium, and year-round city events—this home offers the ultimate in location and lifestyle.
This impressive 6-bedroom, 6-bathroom home features a highly functional layout with all but one bed and bath on the first floor. Each bedroom has its own dedicated bath, offering comfort and privacy for family and guests alike. The spacious primary suite is a true retreat with a beautiful spa-like bath and a massive walk-in closet. A second primary suite upstairs includes a private balcony with peaceful views of the backyard.
The light-filled open layout includes a dedicated study with closet and a formal dining area perfect for gatherings. The gourmet kitchen features a built-in refrigerator, Thermador appliances, adding to the list is a wine grotto with wine fridge and iron door.
Designed for entertaining, the home centers around a resort-style backyard oasis with a sparkling oversized pool, relaxing hot tub, gas fire feature, travertine decking, putting green, and luxurious outdoor living space equipped with Bull appliances, a built-in Primo ceramic grill, and electric patio shades. Accordion-style doors create seamless indoor-outdoor flow, while custom landscaping provides beauty and privacy.
Additional highlights include a first-floor media room and game room with bar and beverage fridge, 4-car garage, gated driveway with extra parking, and premium finishes throughout.
An entertainer’s dream in one of Keller’s most sought-after communities—this home has it all! Truly a must see!
#20957493

Keller

508 Myrtle Court

6 Beds

6 Baths

6,377 Sq.Ft.

$2,100,000

MLS#: 20957493

Discover the epitome of luxury living in this 5 bed, 6 bath masterpiece. The grandeur of this home unfolds with a magnificent open layout featuring vaulted ceilings. The high end kitchen is a culinary enthusiast's dream, spacious island, Dual Butler pantries and a wet bar for effortless entertaining. Experience indoor outdoor living as a 16ft wide Sliding Door leads you to an oversized patio equipped with overhead heaters and retractable screens, perfect space for year round enjoyment. First floor master is a private sanctuary, Showcasing a luxurious bath with an oversized vanity. Additional bedrooms, one on the first floor and three upstairs, each offer private baths. With its thoughtful design and masterful craftsmanship, this home exemplifies modern elegance for those seeking the finest in Dallas living.  Situated in this exclusive Dallas neighborhood close to many private schools. For Video Tour Search Youtube: Discover Luxury Living at 4406 Ridgeside Drive, Dallas, Texas 75244
#20407084

Dallas

4406 Ridgeside Drive

5 Beds

5 Baths

5,382 Sq.Ft.

$2,100,000

MLS#: 20407084

Conveniently located near shopping and dining, with easy access to U.S. Highway 75 Central Expressway, 121 Sam Rayburn Tollway & US 380, this is the perfect choice for those looking for a clean, peaceful, and professional building in a prime location. 
It will be great for office and Medical center.
The total space is 6231 SqFt including optional Storage or office on second floor.
#20757779

McKinney

2220 Bush Drive

None Beds

None Baths

5,831 Sq.Ft.

$2,100,000

MLS#: 20757779

Light, bright & located in University Park with beautiful mature trees on a 60x140 lot in Boone Elem, this traditional home features a center hall floor plan with gorgeous formal dining & living room in front of the home. It also features a downstairs fifth bed room with connected bath—currently serving as a work-from-home office. A second built-in desk upstairs is adjacent to laundry room. Family room & kitchen in rear of first floor are spacious & great for entertaining. Extra storage & cooler under the stairs. Kitchen has enough counter & pantry space to please any chef. Third living area upstairs along with primary bedroom, a secondary bedroom with private bath & two other  bedrooms with jack & jill bath.
#14665327

University Park

2815 Stanford Avenue

4 Beds

4 Baths

4,861 Sq.Ft.

$2,100,000

MLS#: 14665327

Live your very own version of the Yellowstone lifestyle in Lucas, TX!  This sprawling and elegant custom home was designed with Texas style living and entertaining in mind. Situated on 13.81 acres with a private Florida-bass stocked lake, parking for up to 10 vehicles and RV and an incredible 4,000 square foot stable with 1,600 second floor for potential living quarters. The main house is graced by three stone front fireplaces and plenty of room for entertaining with formals, central living space and oversized family room.  Master suite has recently updated bath with gorgeous soaking tub and walk-through double shower. Beautifully open kitchen is centered at the heart of the open floorplan and nearby coffee bar features KitchenAid pellet icemaker. Horses are allowed and the entire property is enclosed with pipe rail fencing. Enjoy the beautiful sunrise over your own lake in the nature lover's dream.
#20019124

Lucas

1350 Shepherds Creek Drive

4 Beds

3 Baths

5,037 Sq.Ft.

$2,100,000

MLS#: 20019124

This is an excellent opportunity to acquire a spacious 8,500 sq ft commercial building with exceptional 1-20 frontage in sought-after Parker County. Currently set up as a retail showroom, the building offers nearly 4,300 sq ft of retail space with great visibility and access. Additionally, the property includes almost 4,300 sq ft of warehouse space, providing ample storage and operational capacity.
The building features 16-foot eaves, offering versatility for various uses, and includes a loading dock for easy shipping and receiving. The warehouse is insulated and equipped with gas heaters, ensuring a comfortable working environment year-round. The property also includes separate men’s and women’s restrooms and a break room for staff convenience. Located inside the Hudson Oaks ETJ (Extraterritorial Jurisdiction) but not within the city limits, this property offers both visibility and flexibility for your business.
With its spacious layout, prime location, and strong infrastructure, this property presents a fantastic opportunity for a variety of businesses. Don’t miss out on this rare chance to own a well-positioned commercial space in Parker County. Contact us today to schedule a tour!
#20795401

Hudson Oaks

3535 Fort Worth Highway

None Beds

None Baths

8,580 Sq.Ft.

$2,100,000

MLS#: 20795401

Imagine sitting on your spacious front porch, watching the sun setting over your 63 acres in Anna. This amazing ranch has a large 38-stall barn, indoor riding arena, private stud stalls, large pond, is completely fenced and cross fenced, and has other great amenities. The ranch house has 3 bedrooms and and 2 full baths along with newly updated stainless steal appliance and granite countertops in the kitchen. Plus, the property is within minutes of the recently widened Highway 121. Currently, the property is a horse rescue and sanctuary and is the home to many senior horses. It also has a dog rescue with a training and boarding operations. This property to could make a great cattle or horse ranch or investment property with the quickly growing city of Melissa just minutes away! Please know that property is in a floodplain, but it is not in a floodway - confirmed by FEMA via their floodway maps (viewed in the pictures).
#20493787

Anna

13308 County Road 577

3 Beds

2 Baths

1,792 Sq.Ft.

$2,100,000

MLS#: 20493787

New Contemporary Construction in Preston Hollow. This home has a large, open and flexible floor-plan with soaring ceilings and great light. Clean lined kitchen has huge island, quartz counter-tops and a stainless steel appliances including built-in, double fridge. Sliding doors lead out to a covered patio. Oak, hardwood floors handlaid throughout. Primary BR is downstairs and includes en-suite bath and 2 walk-in closets. 2nd level has 5 additional bedrooms, a game room, and media room. Spaces are flexible and could be appointed as home gym, home office, or playroom. Big backyard includes a covered pavilion attached to the home and plenty of room for a pool. The property backs up to the The Northhaven Trail and is minutes from shopping and dining at Preston Royal and Preston Forest shopping Centers.
#20003569

Dallas

6449 Royalton Drive

6 Beds

5 Baths

6,411 Sq.Ft.

$2,100,000

MLS#: 20003569

INVESTOR READY. Long-Term & Short-Term Living. 5 Units New Construction LUXURY CONDOS for SALE in Medical District (Near Southside Magnolia Village). Minutes to Hospitals & Downtown. Easy access I-35W & I-30, Dallas. Currently, 4 Units Occupied. Energy Efficient Wall Framing, Zip Sheathing, Shingled Roofs, Low-E Windows, Spray Foam Insulated Ext Walls, Pest Control System, Fire Rated Walls Btwn Units, Fire Alarm & Sprinkler Systems. Kitchens: Modern Euro Cabinetry, Quartz counters, Tiled backsplashes, Electric Samsung Appliances. Open Plans. Ensuite Bedrooms. Master Baths feature tubs & walk-in showers with tiled surround. ROOFTOP PATIOS. PRIVATE GARAGES. SmartThings HUB. LED lighting. 16-SEER HVAC.
#14706044

Fort Worth

1120 Galveston Avenue 12345

9 Beds

9 Baths

6,349 Sq.Ft.

$2,100,000

MLS#: 14706044

Located in the prestigious gated and guarded Normandy Estates, this 2019 custom built home is simply an amazing creation. An abundance of natural light with an open floor plan beckons to be moved into without any updates needed.  Your personal retreat lends itself to stylish comfort yet an excellent design for entertaining.  The large living room features a linear fireplace that soars to the high ceiling creating a spacious warm environment. The high end appliances makes the kitchen, the heartbeat of any home, an area that you will be content to spend time in gathered around the large island making memories. The Master suite is highlighted by the opulent bath area which is so inviting after a long day to immerse yourself in its beauty and comfort.  Outside is a garden area that is private and serene that is so well thought out.  Even the upstairs has a relaxing living area perfect for cozying up with a book or watching your favorite productions. Did I mention the craft room? Call now!!
#20565968

Plano

6817 Cousteau Court

3 Beds

3 Baths

4,037 Sq.Ft.

$2,100,000

MLS#: 20565968

Bright and full of luxury in Midway Hollow and Dallas' Private School Corridor! This brand new home is full of designer upgrades and custom finishes with no detail overlooked. Kitchen features GE Monogram appliances, including a commercial cooktop, a pantry-prep kitchen with second sink and dishwasher plus room for a second refrigerator. Bar and wine room located next to the kitchen features a built-in wine fridge, bottle storage, ice maker and built-in beverage cooler. Oversized Laundry Room includes a pet wash, sink and pass through to Primary Closet. Enjoy outdoor living on the covered patio directly from the Family Room or on the second level you can enjoy indoor-outdoor entertaining in the Game Room and attached Covered Balcony patio. Come see this custom stunner and fall in love with all the exquisite details!
#20439648

Dallas

3969 Davila Drive

5 Beds

5 Baths

5,361 Sq.Ft.

$2,100,000

MLS#: 20439648

Newly constructed Midway Hollow modern farmhouse by Conifer Homes. Impressive 2-story foyer leads to an entertainer’s great room with oversized wood-burning fireplace & wet bar. The designer island kitchen offers Quartzite counters, built in refrigerator & service pantry with a secondary sink for the chef in the family. The primary bedroom suite & study are on the first floor. Second level features game room & three-bedroom suites, each with a private bathroom. Features include wide plank hardwoods, JELD WEN wood-clad windows, Lutron lighting, foam insulation, 19 Seer HVAC, tankless hot water & full landscape package. Oversized 100 ft. wide corner lot on a tree-lined street in Withers Elementary School zone. Features sheet and floor plan available upon request.
#20318286

Dallas

9857 Mixon Drive

4 Beds

5 Baths

5,295 Sq.Ft.

$2,100,000

MLS#: 20318286

44+ Acre Ag Exempt Property with Trails and Water Access.  
Explore 44.169 acres of Ag Exempt land offering a blend of open pasture, wooded areas, and elevated views in a convenient location near Sherman, Texas. With over 1,300 feet of county-maintained road frontage, this property provides flexible access and multiple potential build sites.

The land features rolling terrain at approximately 800 feet elevation, creating scenic vantage points across ponds, fields, and the surrounding countryside. Approximately 10 acres are wooded, offering natural privacy and shade, while the remaining acreage provides open space suitable for a variety of uses.

A network of approximately 3 miles of established trails allows easy navigation throughout the property, ideal for recreational use and exploring the landscape. Five water access points are located across the property, supported by over 1,000 feet of installed waterline and a meter box positioned near the road.

Improvements include a 10 x 16 cabin equipped with HVAC, ceiling fan, loft spaces, and utility connections, along with a bathroom and kitchen area featuring sink hookups, washer and dryer connections, shower, and toilet. Outdoor features include hot and cold water access, an exterior sink hookup, and a covered porch area. A 40-foot high cube shipping container with power provides additional storage or workspace. A barn-style shed is in progress, and a designated picnic and bonfire area enhances outdoor usability.

Electricity and water are available on site. The property is located outside city limits with no HOA.

Conveniently located near Lake Texoma and Lake Bonham, and approximately 15 minutes from Sherman, this property offers a balance of accessibility and open space.
#21062969

Sherman

1578 Campground Road

None Beds

None Baths

44.169 acres

$2,100,000

MLS#: 21062969

The Ohlenbusch Ranch is 457 acres of rolling prairie grass ranch land providing excellent grazing for livestock and good hunting.  Conveniently located half way between Hamilton and Goldthwaite on paved FM 2005, it’s an easy commute from DFW, Austin and Waco.  This ranch provides great grazing pastures and good hunting.  

The Headquarters sits back off the road on top of a hill providing a beautiful and peaceful setting to enjoy the open space with great views, star filled skies and amazing sunsets.  This is a functioning cattle ranch complete with 1824 sq ft brick home featuring 3 bed and 2 bath, large covered back patio with storm cellar, barns and corrals and good water well.  

The ranch has very good fencing around the perimeter and dividing the property into 3 pastures and a large trap for gathering animals and moving to the pens at the headquarters.  The pastures have a good turf of native grasses that have been allowed to rest for a couple of years in recovery from drought conditions.  The north pasture is moderately wooded with oaks and other hardwood trees and brush and has several wooded draws and a live spring providing a constant water source for wildlife.  

This is a quality native grasses ranch that has historically been a 35-40 animal unit cow calf operation and family hunting property.  It is ready to move in and start using.
#20870365

Hamilton

2655 Farm Road 2005

None Beds

None Baths

N/A

$2,100,000

MLS#: 20870365

Fully Approved 39-Lot Residential Development Opportunity in Lancaster, Texas

Steel Hollows Addition is a fully approved, fully entitled, shovel-ready 39 lot single family subdivision.Spanning approximately 10.70 acres, 465,961 square feet, the project offers builders and developers a rare opportunity to acquire a ready-to-execute residential community in one of southern Dallas County’s growing development corridors.  

The approved development package includes planned internal streets, proposed 8-inch water and sewer infrastructure, detention pond, drainage easements, utility easements, HOA-maintained open space, common-area landscaping, entry monument design, cedar fencing, and stone columns.  

Positioned near N. Houston School Road and approximately 926 feet from Belt Line Road, the site offers strong regional connectivity with access to nearby residential neighborhoods, employment corridors, and major infrastructure. The property is also exceptionally close to Google’s new $600 million Red Oak data center, a major North Texas investment expected to support continued growth and long-term housing demand in the surrounding area. Google announced plans to invest more than $600 million in the Red Oak data center over multiple years.  

This offering is ideal for builders, developers, and investors seeking a fully entitled subdivision with major planning, civil, utility, drainage, and landscape components already planned.
#21264147

Lancaster

1251 N Houston School Road

None Beds

None Baths

10.7 acres

$2,100,000

MLS#: 21264147

1 ... 559 560 561 562 563 ... 666
* Listings identified with the FMLS IDX logo come from FMLS and are held by brokerage firms other than the owner of this website. The listing brokerage is identified in any listing details. Information is deemed reliable but is not guaranteed. If you believe any FMLS listing contains material that infringes your copyrighted work please click here to review our DMCA policy and learn how to submit a takedown request. © 2024. First Multiple Listing Service, Inc.
 - property

Send a message

Message successfully sent.

Your message

What is 3 + 4 ?

Reason for contacting?

I agree to receive email communication and understand I can unsubscribe at any time.

I agree to be contacted by Next Level Realty Group via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Sign Out

Virtual Assistant

Would you like to take the next step with this property? We can help you schedule a showing or virtual tour, or send you more details.

Yes, I would like more information.

Thank You for Your Reply, One of Our Agents will contact you as soon as possible

No, maybe later.

Thank you, you can always contact me via email, phone number or through the contact form.

Realhub AI

Lucy - Your AI-Powered Realtor

Update Your Temporary Password

Personalize your search

Enter your email and we'll notify you immediately when new listings match what you're looking for.

or enter email address

Already have an account ? Login here

Continue your home search

I agree to receive communications and understand I can unsubscribe at any time.

I agree to be contacted by Next Level Realty Group via call, email, and text for real estate services. To opt out, you can reply 'stop' at any time or reply 'help' for assistance. You can also click the unsubscribe link in the emails. Message and data rates may apply. Message frequency may vary. Privacy Policy

Already have an account ? Login here

We use cookies

We use cookies primarily for analytics to enhance your experience. By accepting, you agree to our use of these cookies. You can manage your preferences or learn more about our cookies policy.